Monday April 30th – SDCC General Meeting at 730pm – Bonaventure Apartment Development Presentation

Click here for a printable version of the agenda  4.29.19 SDCC Agenda

SDCC General Meeting Agenda
Monday April 29, 2019 from 7:30 to 9:00pm
Ocean Park Volunteer Rescue Squad Hall – 3769 East Stratford Rd
(parking in back, on side streets and across Shore Drive)

Special Presentation –

Bonaventure Realty Group – Expansion Plans for Windsong Apartments on Pleasure House

Representatives from the Bonaventure Realty Group will present their current plans to redevelop and expand the Windsong Apartment complex located on Pleasure House Road north of Shore Drive. Previously presented plans had the old apartments being increased a total of 160 units from 272 to 432. A question and answer session will follow the presentation. As always, all are welcome to attend SDCC meetings.

Officer’s Reports

Secretary – Kathleen Damon
Treasurer’s Report –Tim Solanic
Vice President – Wally Damon
President – Todd Solomon

Old Business-
Bayfront Beach Replenishment Update – An update on the project will hopefully be available. The project has been delayed and appears to continue to be pushed to the right and will most likely take place through the summer season. When is the start date and what are the impacts to the beach during construction?
4th of July Fireworks for Cape Henry Beach – City Council and Staff are evaluating the request to take over the planning and execution of the show. A decision should be forthcoming after the “Something in the Water” event is over which will allow Staff to focus on the request.
Dog Leash Law for Beaches – A public hearing was held on Wed April 10th at 630pm at the City’s Law Enforcement Training Facility. City Council has request the topic be studied for a year before any changes are made to the code. A steering committee will be formed to help with this evaluation. It is SDCC plan to invite representatives of this committee to a future SDCC to present their plans and how our community can provide input.

New Business –
Parking Meters at Lynnhaven Boat Ramp – The City has installed a metered parking kiosk for public parking at the Lynnhaven Boat Ramp. If you plan on using this lot, please be aware of the update to avoid tickets.
Shore Drive Improvements in Ocean Park to Start Soon – $600,000 of improvement to the Shore Drive/Stratford Road intersection, is fully funded and expected to begin later this spring. This would involve a “fully functional” traffic light with pedestrian crossing signals, an emergency signal to accommodate Ocean Park Fire and Rescue
Cape Henry Ditch Volunteer Clean Out Corps Proposal – Representatives of the Chesapeake Bay Foundation will be discussing a plan to have volunteers clean out and maintain a section of the ditch behind Food Lion. The Cape Story meeting will take place on Monday May 13th at 7:30pm at Lynnhaven Colony Congregational Church.

Upcoming Chances for Civic Engagement
Tuesday April 30th City Council Budget Input – 6pm at City Council Chambers. Other ways to provide comments are posted at https://sdcc.info/2019/04/25/city-budget-public-hearings-scheduled-last-chance-for-input-on-tuesday-april-30th/
Tuesday May 14th Chesapeake Bay Foundation (CBF) Forum – 6:00pm – 8:00pm @ Brock Environmental Center (3663 Marlin Bay Drive, Virginia Beach 23455). Speakers will discuss the Chesapeake Bay Clean Water Blueprint (Phase III Water Implementation Plan/WIP).
Tuesday June 11th – Primary Election – 6am to 7pm at your normal polling locations.

Community Concerns– Please share any issues or concerns your groups/organizations may have at this time.

***Next SDCC Meeting – Monday May 20, 2019***
Please note the meeting will be a week early due to Memorial Day

New required metered parking at beloved LBR&BF

Started yesterday.

LBRBF-MeteredParking

Apparently the City was inspired to replace the honor system with the new required metered parking because of so much abuse including some ignorant users of LBR&BF mouthing off to Parks & Rec staff who work their.

For those who don’t pay, you will be ticketed and may be towed. New box is self explanatory.

#LESNERBRIDGE Ribbon Cutting yesterday at beloved Lynnhaven Boat Ramp & Beach Facility

3 Mayors, 2 City Managers, 2 Delegates, 2 VB City Councilman and a lot of senior VB Staff who helped make it happen attended plus neighbors who love the new Lesner.

There was even a surprise light show by Randy Burkett Lighting Design who also attended.

Yay!

Monday Nov. 26th SDCC General Meeting – Special Presentation “Bayfront Beach Sand Replenishment”

HAPPY THANKSGIVING – May you enjoy your time with friends and family.

Click here for a printable version of the agenda – 11.26.18 SDCC Agenda

SDCC General Meeting Agenda
Monday November 26, 2018 from 7:30 to 9:00pm
Ocean Park Volunteer Rescue Squad Hall
(parking in back, on side streets and across Shore Drive)

Special Presentation-

Bayfront Beaches Sand Replenishment Update
Mr. Phillip Roehrs, City of Virginia Beach Public Works – Water Resource Engineer, will provide an update on current plans for sand replenishment project for Bayfront beaches. The last replenishment happened 5 years ago and our beaches are in dire need of help. When will dredging and replenishment begin? Where will the sand be placed? How long will the projects take? Will sand from the spoil sites be required as in past projects? These questions and others you may have will be discussed.

Officer’s Reports: Secretary – Kathleen Damon; Treasurer’s Report –Tim Solanic; Vice President – Wally Damon; President – Todd Solomon

Old Business-
Ocean Shore Shoppes Mixed Use Development Update – According to the current property owner, the proposed mixed use development will not be built. The property will be sold to Greystar/Overture Apartments.

Shore Drive Phase III Update – Shore Drive Phase III (CIP 2-117) is set to go out for bid in Feburary 2019 with construction to start sometime in the summer of 2019. This $26 million project will provide sidewalks, crosswalks, LED street lighting, bike lanes, improved traffic signals and landscaping. 4 lanes of traffic will be maintained during construction to minimize traffic delays. In addition to the road safety improvements, storm water upgrades will be made to some streets to help improve heavy rain collection and removal capabilities.

Lesner Bridge Replacement – The end is in sight. Paving of westbound lanes and bridge landings should be taking place soon now that the sidewalk has been completed. Updates are being posted at http://www.sdcc.info as they are received.

New Business –
Lynnhaven Municipal Wharf – Latest rumor is the site will be used as a staging site by Dominion Power for construction of offshore wind turbines. Does anyone have additional information regarding this subject?

Virginia Beach Police Department New Initiatives – Next Generation 9-1-1(texting based 9-1-1) and ePRO (electronic Police Reports Online), an interactive web application that allows public access to reported crime, traffic accident reports, and active warrants are new systems currently being used by the City. Check them out at the City’s website –

NG 9-1-1 Link
ePRO Link

Community Concerns– Please share any issues or concerns your groups/organizations may have at this time.

PLEASE NOTE REVISED MEETING DATE
Due to Christmas and New Year Eve

***Next SDCC Meeting – Monday December 17, 2018***

SDCC General Meeting – Mon Oct 29th at 7:30pm – Special Presentation “Heads Up Emergency Disaster Preparedness Program”

Click here for a printable version of the agenda 10.29.18 SDCC Agenda

SDCC General Meeting Agenda
Monday October 29, 2018 from 7:30 to 9:00pm
Ocean Park Volunteer Rescue Squad Hall
(parking in back, on side streets and across Shore Drive)

Special Presentation –

Heads Up Emergency Disaster Preparedness Program
Ms. Tanya Barnes, Vice President Chesapeake Beach Volunteer Rescue Squad, will discuss their program that helps identify residents that need special assistance and support during emergencies and disasters. She will also discuss ways that the community can better serve these individuals.

Officer’s Reports:
Secretary – Kathleen Damon
Treasurer’s Report –Tim Solanic
Vice President – Wally Damon
President – Todd Solomon

Old Business-
Ocean Shore Shoppes Mixed Use Development Approval – The Board of Zoning Appeals (BZA) approved the variance request to build a 4 story, 2 condo and commercial space structure at the corner of Ocean Shore Ave. and Cherry Tree Lane. Many adjacent residents attended the meeting in opposition. This was the only required approval needed and no conditional use permit will be necessary.

Lynnhaven Municipal Wharf – Updates from City’s permit request to the Army Corps of Engineers and the Department of Environmental Quality to keep the wharf as a permanent structure for multiple uses. The DEQ has approved of permit.

Short Term Rentals (STR) – On Sept 1st, City Council passed a resolution regarding regulations for STRs. An update on this resolution will be presented.

Lesner Bridge Replacement – Paving of westbound lanes and bridge landings will be taking place and updates are being posted at http://www.sdcc.info as they are received. A separate turning lane will be added during restriping to the eastbound landing at Vista Circle intersection. LED lighting has been installed on bridge structure and supports and is in the testing phase.

New Business –
Bus Route 35: Shore Drive to Oceanfront – Operating Season is over and was considered a success by HRT and the City. Plans to budget and operate next year are in the works. SDCC will be creating a questionnaire to gather input and suggestions to pass on to HRT/City staff to help make next years service even better.

Shore Drive Overlay Development Review Requirements– The resent approval of the Ocean Shore Shoppes brings into question a possible loophole for building development review process. It appears review of mixed use (residential + commercial) depends on the number of units and zoning. Not all projects require a conditional use permit (CUP) or board/committee/council approval at which the public has the opportunity to comment. Should this be changed?

Community Concerns– Please share any issues or concerns your groups/organizations may have at this time.

***Next SDCC Meeting – Monday November 26, 2018***

 

Update about jackhammering in the middle of Monday & Tuesday nights by LBR&BF

From an email:

Folks:

Hopefully everyone has been enjoying the new eastbound Lesner Bridge since its opening on Labor Day weekend. First of all, I want to apologize to all of you who live in Ocean Park that endured the noise from road work on East Stratford Road in the early morning hours of Monday 10/22 and Tuesday 10/23. Several lines of communication within the project team were broken and resulted in not just one night of disturbance, but two. For that we sincerely apologize to everyone affected.

We scheduled this night time work on East Stratford Road to minimize the disruption of operations of the Lynnhaven Boat Ramp and American Brew. However, in order to minimize the night time noise created by this milling and paving work, we are going to complete the paving work on East Stratford Road and Piedmont Circle during the day on Thursday 10/25/2018. Therefore, beginning at approximately 9:00 AM and ending some time near 6:00 PM on 10/25/2018 expect East Stratford Road to be CLOSED between Piedmont Circle and Shore Drive and Piedmont Circle to be CLOSED between East Stratford Road and the showers at Lynnhaven Boat Ramp while paving operations are underway.

Piedmont Circle Closure at Lynnhaven Boat Ramps for October 25, 2018

Piedmont Circle Closure at East Stratford Road for October 25, 2018

East Stratford Road Closure for October 25, 2018

Paving work is also taking place TONIGHT, 10/23/2018. Beginning tonight about 8:00 PM and lasting until 5:00 AM, road crews will be preparing to place the final asphalt surface course on eastbound Shore Drive located between the bridge and Vista Circle. This paving work will also include the intersection of Shore Drive and Vista Circle, Vista Circle between Shore Drive and Cape Henry Drive, and Cape Henry Drive between Vista Circle and the entrance to Bubba’s Restaurant.

Another update will be sent out once we have a firm schedule for the upcoming paving work for westbound Shore Drive between Page Avenue and East Stratford Road.

Thank you all again for your patience as we push through the final stages of this multi-year project.

Sincerely,
-Chris

Christopher J. Wojtowicz, PE
Engineering Construction Manager
City of Virginia Beach
Department of Public Works
Engineering Division
2405 Courthouse Drive
Virginia Beach, VA 23456-9031
Office: (757) 385-5785
Fax: (757) 385-5668
Email: cwojtowi@vbgov.com